Phases of a SAP Project (ASAP)

Phase I: Project Preparation

  • Decision makers define clearly Project objectives and an effective decision making process.
  • Define Project organization and Roles.
  • Implementation scope is finalized
  • System Landscape and technical requirements are finalized
  • Infrastructure (Hardware/Interfaces)
  • High level Strategies for client
  • Archiving strategy
  • Issues of Data bases
  • Other issues like
  • Unanticipated tasks
  • Normal tasks that can not be completed
  • External factors that need to be dealt with


Phase II: Blue Print Phase

  • Scope of R/3 implementation is defined.
  • Business blue print is created.o Tools used for this is ASAP Implementation assistant
  • Question and Answer Data
  • Base (Q&A dB) Business Process Master List (BPML)
  • R/3 Structure
  • Modules Business Navigator and External Modeling tools?
  • Project Management (Activities like…)
  • Conducting Status Meeting for Project Meeting
  • Conducting Steering committee meetings
  • Addresses the issues like Organizational Change Management
  • Other Activities Like
  • Project Team Training
  • Developing the system environmento Defining Org Structure
  • Define Business Process

Phase III: Realization Phase

  • Configuring the R/3 System
  • Defining the Authorizations in R/3
  • Defining the work flow
  • Creating Use Documentation
  • System manager procedures
  • Developing the System Test plans
  • Define the Service level Commitment
  • Establishing the System Administration function
  • Setting up the Quality Assurance environment

Phase IV: Testing and Final Preparation

  • Testing, user Training, System management and Cutover activities
  • Test Plan has the activities of:
  • Testing the conversion procedures and programs
  • Total Interface programso Volume and Stress testing
  • Final User acceptance testingo Developing a Final Go-Live strategy
  • Redirection to Go-Live? Preparation of End-user documentation
  • Training for the End Users
  • Technical environment installation on Production system and testing
  • Transfer of Legacy data and preparation plan for Go-Live


Phase V: GO-Live Phase

  • Production support facilities are carried out
  • Validations of Business process and their configuration
  • Follow up training for End Users
  • Sign–Off.

Accelerated SAP Introduction

Enterprise application software has to cover a broad spectrum of functionality, yet be configured flexibly enough to meet specific requirements, which can vary enormously. SAP’s answers to this challenge are AcceleratedSAP and the R/3 Business Engineer, providing a comprehensive solution for implementing R/3 quickly, easily, and according to your own needs even during productive operation.

Born out of the need to cost effectively configure R/3 to order, AcceleratedSAP and the Business R/3 Engineer support custom configuration of R/3. You can tailor the R/3 components, functions and organizational structures to your needs, hiding and/or deactivating those functions that are not required.

Fig. 1: The R/3 Business Engineer Complements ASAP

AcceleratedSAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step guide that incorporates experience from many years of implementing R/3. Along with that, AcceleratedSAP contains a multitude of tools, accelerators and useful information to assist all team members in implementing R/3. Quality checks are incorporated at the end of each phase to easily monitor deliverables and critical success factors. ASAP is delivered as a PC-based package, so that - if required - an implementation project can begin prior to having an R/3 System installed.

The R/3 Business Engineer contains a set of configuration and implementation tools which enable you or your consultants to define and configure R/3 and also to adapt an existing configuration to new needs or changed circumstances. The Business Engineer is resident to R/3.

So that its customers can implement R/3 as quickly as possible, SAP has standardized the implementation procedure, simplified the way functions are presented and reduced the technical complexity of implementation.

AcceleratedSAP and the Business Engineer help you configure R/3 according to your own needs using proven, industry-specific business scenarios and processes. Whether implementing new processes in your enterprise or restructuring old ones, R/3 can release the full potential of change for you. AcceleratedSAP and the Business Engineer help you determine which of R/3’s proven processes are most suited to your business, and then help you configure to meet your specific needs. The benefit is obvious: Restructuring enterprise processes in the R/3 System leads to a rapid and efficient production startup, meaning a faster return on investment.

By simplifying configuration, ASAP and the Business Engineer make the power of R/3 more accessible, helping companies to lower their dependence on expensive specialists or outside consultants. The user-friendliness of ASAP and the Business Engineer make them particularly suitable for the following groups:

  • Business professionals who need to discuss, prototype and design their business blueprint (enterprise model)
  • IS departments of large enterprises who need to customize R/3 applications more efficiently and more rapidly
  • Small and medium-sized companies previously wary of implementing R/3 because of the perceived scale of such projects
  • Consultants and SAP partners looking for an efficient way of offering their customers configure-to-order or wishing to develop R/3-based solutions for niche markets

Together, AcceleratedSAP and the Business Engineer empower you to manage cost, time and quality without compromising on implementation requirements. Some of the features offered are:

Reduced implementation times and faster return on investment through structured planning and preconfiguration

  • Intuitive understanding of the wide range of functions offered by R/3
  • Process optimization using proven scenarios, processes and value chains, illustrating clearly the software’s capabilities and offering practical help when you configure the R/3 System.

High quality installations through comprehensive procedural guidelines

Optimizing business processes using SAP Business Workflow, via process monitoring and automation of procedures

  • Continuous, dynamic adjustment and optimization of R/3 applications
  • The capability to copy configured areas, for example, by transferring existing settings to new organizational units.

AcceleratedSAP and the Business Engineer are designed for openness and new platforms, using HTML-based documentation. Compatibility with many third-party modeling tools and software packages, for example, Microsoft Excel, is ensured.

Available Tools

Embarking on an implementation project requires a lot of careful thought beforehand. You need to think about what you want to accomplish, the optimum sequence, and the business cases that are best suited to your needs. But SAP has already done a lot of the thinking for you and packaged its findings in the following tools. They are then described in more detail in the following chapters organized according to the corresponding AcceleratedSAP phases.

  1. AcceleratedSAP (ASAP): A comprehensive solution for the introduction of the R/3 System in your enterprise. ASAP and most of its tools can be used independently of an R/3 installation.

The tools available for AcceleratedSAP are:

  • The Project Estimator, an internal SAP tool which enables SAP consultants to accurately gauge the required resources, the costs and the time frame of implementation. The Project Estimator takes into account the project scope and several project and risk factors.
  • The Concept Check Tool, a tool enabling you to carry out quality checks on the project preparation, technical infrastructure and R/3 configuration settings. This is done mainly during the first two implementation phases of the R/3 project. In this way you are alerted to potential data volume and configuration conflicts that could lead to performance issues if not addressed.
  • The Implementation Assistant: The ASAP navigation tool that accompanies you through the five phases of implementation down to the task level. It includes a description and a detailed "how-to" for each task in the Roadmap. Along with that, many tools, templates and documents are hyperlinked to the task. The Implementation Assistant contains the following elements:
  • ASAP Implementation Roadmap
  • and Project Plan. The Roadmap contains the five phases, from which you can drill down into work packages, activities and tasks. The Project Plan contains three components, a budget plan, a resource plan and a work plan. These are explained in more detail in the next chapter.

The ASAP Roadmap is the successor of the R/3-based Procedure Model, which was used until Rel. 3.1 in R/3 implementation projects.

  • Knowledge Corner
  • , containing tips and tricks for configuration from consultants, detailed documentation on SAP’s implementation services, information on technical tools, as well as simplification guidebooks and R/3 Customizing wizards.
  • Question and Answer Database (Q&Adb).
  • Using the R/3 Reference Model structure, the Q&Adb is used to assist in gathering requirements for business processes, conversions, reports, interfaces, enhancements and authorizations. The database provides useful questionnaires to help you define the process needs and also serves as a repository for all this information. Since it is a database, it allows for flexible reporting. The business requirements generated from the Q&Adb are collectively known as the Business Blueprint.
  • Business Process Master List
  • , to manage configuration, testing and the creation of end user documentation. The Business Process Master List is linked to pre-written Business Process Procedures (BPPs), detailled end-user documentation for R/3 transactions.
  • Issues Database
  • : supporting project management, this database supports the entering, monitoring and managing of issues that come up during the project.
  1. R/3 Business Engineer:
  2. The implementation tools for the high-quality configuration of the R/3 System are:
  • R/3 Reference Model: Comprehensive graphical process flows describing the R/3 functionality from different points of view. It contains scenarios, processes and functions, as well as components. The R/3 Reference Model can be viewed using SAP's Business Navigator and the Business Navigator Web, or using third-party modeling tools available from modeling partners.
  • Implementation Guide
  • (IMG): Used to configure all system parameters for the business processes in R/3. It contains project management functionality and a menu-driven view of all R/3 Customizing activities. Every activity can be documented in detail, and responsibilities and statuses can be assigned.
  1. Preconfigured systems:
  • Preconfigured US and Canadian clients: Provides a head start on baseline configuration. It includes a preconfigured US/Canadian chart of accounts, print forms, account determination, units of measure, etc. The predefined test sequences that are included can be a starting point for integration testing.
  • Preconfigured industry systems: A number of complete preconfigured clients consisting of an industry-specific model and preconfigured business processes for the needs of a particular industry in R/3 are available. For more information on preconfigured systems, see the description of Phase 2, Business Blueprint or the information on the IDES System in this chapter.

Continuous Business Engineering

In today’s fast-moving, ever-changing business climate, companies are in a constant state of flux and their mission-critical applications must adapt and evolve at the same speed. If software cannot grow with the needs of a company, the company will quickly find itself in a straightjacket.

Furthermore, an ERP application needs to let you move forward fast, knowing that you can roll back changes without downtime.

An enterprise's organizational structure and the corresponding R/3 implementation created using the Business Engineer are not "set in concrete", they can be modified at any time. Examples of possible changes, which can be made rapidly include the following:

  • Addition or removal of entities within the organization structure (for example, business units, production plants, warehouses, etc.)
  • Introduction of new staff, promotion, reallocation of work tasks, and maintenance of authorization profiles
  • Changes to the reporting or cost/profit center structure
  • New and concurrent currencies
  • Accommodation of changed legal requirements (for example, new tax rates, new employment legislation)
  • Activation or deactivation of R/3 functions
  • Optimization of business processes
  • Support for new and multiple versions of R/3

In addition, SAP offers a range of services if you want support for some of these changes, for example, conversion services to support mergers and acquisitions. Standard Euro services are a further example of the available services.

AcceleratedSAP and R/3 Business Engineer take the hassle out of implementation procedures and change management. Modifications can be made at any time, and the compatibility of changes can be verified with other configuration decisions, thus supporting their smooth, trouble-free introduction into the productive system.

Accelerated SAP ii

AcceleratedSAP is a comprehensive solution for the implementation of the R/3 System, comprising a proven methodology, tools and a range of services for the rapid implementation and ongoing optimization of R/3 installations.

The AcceleratedSAP Roadmap and accompanying Project Plan provide a standard implementation "how-to guide" that fills in the gaps of diverse methodologies and varying individual implementation skills and experiences.

The effectiveness of AcceleratedSAP has been demonstrated many times over at companies around the world. The Business Engineer plays a central role in AcceleratedSAP projects, being used for completion of configuration tasks.

Fig. XX: Breakdown of ASAP phases in the Implementation Assistant

The AcceleratedSAP Roadmap covers the different aspects and phases of an implementation. In the Roadmap, a detailed project plan is included for the five phases. The Roadmap provides a standard repeatable procedure for implementing the R/3 System, including project management, configuration of business processes, technical, testing and training aspects. The Roadmap serves as a backbone to AcceleratedSAP. It is located within the Implementation Assistant, a PC-based navigation tool that also contains the AcceleratedSAP accelerators.

The ASAP Accelerators represent a collection of descriptions, how-to's, templates and examples on all subjects relating to the implementation of the R/3 System. Some are short information texts on a particular subject, others are longer texts such as white papers. There are also a number of predefined and empty templates or forms which you can use when carrying out your implementation. The SAP Simplification Group's guidebooks are included. There are about 350 accelerators for AcceleratedSAP 4.0, and they can be accessed from an alphabetical list, as well as being linked to the individual roadmap How-to's.

There are four levels to the roadmap – phase, work package, activity, task. As you dig deeper into the levels, you will find more detailed information, from an overview description at the phase level down to a "how-to" procedure, role assignment, triggers, and tips and tricks.

It is essential that you create a project plan when starting your ASAP implementation project. Project plans have three parts:

  • The Budget Plan contains the projected costs by month, against the actual costs and calculates the variance.
  • The Resource Plan contains the resources assigned to the R/3 implementation. It displays the planned and actual number of workdays per month, as well as the variance between the two. It also contains a cumulative planned hours work sheet.
  • The Work Plan contains a detailed set of phases, work packages, activities, and tasks from the AcceleratedSAP Roadmap. This information is organized in a project management planning tool (MS-Project or Excel spreadsheet). A Gantt Chart is contained within this work plan to view schedules, dependencies and resources in MS-Project.

Three sample project plans are included for a six-month duration, a nine-month duration, and an upgrade project plan. If the Project Estimator is used during the sales cycle and Project Preparation Phase, your individual project plan is generated automatically, taking into consideration company-specific risk factors. The project plan makes sure that nothing is forgotten and that all activities can be tracked and managed. This means, for instance, that the planning for data transfer and the development and testing of interfaces is already included in the project plan.

It is now possible to implement more than one ASAP project at a time. During installation, Rel. 4.0 of ASAP asks you to specify a project name that will apply to the files being installed. In a multi-project environment a new Project Selector icon on your desktop allows you to set the active project, remove projects and review file locations.

You can select installed components such as the Implementation Assistant and Q&Adb in the respective projects as required. Each project is completely separate from the others, so in fact projects installed on the same server could be at different update levels.

AcceleratedSAP is a complete implementation solution. This means that in addition to the Roadmap, the AcceleratedSAP solution contains numerous tools and also references SAP education and services to ensure maximum time savings and a high quality implementation.

AcceleratedSAP uses the Business Engineer implementation tools at all relevant steps. In the figure below, for example, the conceptual design is based on the R/3 Reference Model in Phase 2 (Business Blueprint), whereas the Implementation Guide is accessed from ASAP Phase 3 (Realization).

Fig. 2: AcceleratedSAP Implementation Roadmap and R/3 Business Engineer

Service and Support

ASAP leverages SAP's service and support offering, that is, all the services relating to the SAP R/3 environment. EarlyWatch® Services, concept reviews, and GoingLiveTM checks are just part of the service palette which ensure total quality and let you effectively tune your R/3 System. At appropriate steps in the Roadmap, service products are mentioned and decision support is provided to determine whether you need a particular service. For example, if you have a high volume of transactions, certain tuning services can assist you in optimizing system performance.

Crucial to a fast and cost-effective R/3 implementation are well-trained project teams and highly competent consultants. SAP's innovative R/3 Info Database (InfoDB) ensures that customer and partner employees involved in implementing, servicing and using R/3 have all the qualifications they need. The InfoDB refers to a new training concept based on a new curriculum, which also includes multimedia courses.

  • Level 1 courses provide an overview of the R/3 environment.
  • Level 2 courses introduce you to fundamental business processes.
  • Level 3 courses focus on providing detailed information.

Organizational Change Management

The positive motivation of employees is a key factor in ensuring a successful implementation project. However, most organizations know, or will at least assume that the R/3 implementation will trigger wider changes in the organization. Left unmanaged, these expected impacts could be viewed negatively. Therefore, any change management program must minimize the implementation risks, acccelerate the implementation process, and align SAP with the customer's organization.

ASAP's Change Management is done via a risk assessment tool, by which assessments carried out will help a customer's team deal with issues of credibility, organizational impact, and individual impact of R/3 implementation. Implementing change management procedures involves accelerating the implementation by means such as a matrix that defines the degree to which jobs and responsibilities will be changed after R/3 implementation. The other aspect is to work with executive sponsors to redesign the organization's structure or reporting relationships, for example. The ASAP change management methodology enables you to review and revise the types and sequencing of change tasks, change activities, change packages and change accelerators.

  • A change task is a specific job or function to be completed by the change team.
  • Two or more change tasks roll up into a change activity.
  • A change package is a collection of change activities.
  • Change accelerators are the tools and/or materials that speed up the team's implementation of a processs, activity or task.

Knowledge Corner

The Knowledge Corner contains alphabetized information on all aspects of AcceleratedSAP as well as a lot of tips and tricks for configuration. The information provided here is very helpful during requirements gathering and configuration. The goals of the Knowledge Corner are:

  • To provide application consultants with detailed information and alternatives to configure and understand specific functionality within the R/3 System.
  • To provide detailed information about peripheral activities, such as support services and access to hotline activity.
  • To provide tips and tricks on R/3 implementation activities such as data conversion, authorization management, and forms development.

Some of the newer elements found in the Knowledge Corner are:

  • A link to the R/3 Interface Adviser, which provides a central pool of information to help you design and implement permanent interfaces between SAP R/3 components and non-SAP systems.
  • The R/3 Structure Modeler, which lets you graphically visualize the R/3 System organizational structures of your enterprise using the Structure Modeler Visio® template. Please note, you must be a licensed Visio® user to use this Accelerator.
  • The Report Navigator, which provides a directory of more than 2,000 operational reports available in standard R/3. The Operational Reports in R/3 help you pull and analyze critical transactional information regarding your business. You can use the R/3 Report Navigator to select the report that is optimal for the information you want to retrieve about your business transactions.

Available Languages

Primary components of AcceleratedSAP are available in German and English, as well as Spanish, French and Portuguese.

Accelerated Quality Review

SAP's Accelerated Quality Review provides an independent and objective management review of your R/3 implementation project and identifies any risks to the project goals. This service is standard in all TeamSAP projects. Among others, the benefits are early recognition of potential risk areas, improved adherence to project schedules, lower cost, and faster implementation times.

Fig. 7: Checking and quality tools around ASAP

The Quality Review program offered by SAP is not a review of the project for conformance to the ASAP tools and templates, but rather assists the executive management and project manager at customer sites in providing a second opinion of the implementation progress towards achieving the project goals. The scope of the review is to investigate the application, technical and project management areas of the implementation. The review looks for good implementation practices while following a prescribed methodology.

TeamSAP

TeamSAP refers to the coordinated network of people, processes and products from SAP and partners that delivers continuous, fast, integrated and assured solutions. AcceleratedSAP is the main process component of TeamSAP.

  • The people:
  • SAP employees and certified implementation partners providing leadership, project coordination and know-how to implement, maintain and support R/3 based on your requirements.
  • The processes:
  • AcceleratedSAP with the embedded Business Engineer functionality, as well as integrated support, services and training on all levels.
  • The products:
  • The R/3 System with its strategic product architecture and open interfaces, providing both scalability and flexibility in an ever-changing business environment. Also, hardware and software products from hundreds of complementary software partners and hardware providers certified by SAP.

Fig. 3: Elements of TeamSAP

TeamSAP supports the concept of business change as a continuum. The goal is to offer SAP customers a full complement of TeamSAP resources to enable rapid technology upgrades or change-outs for access to new functionality. With respect to ASAP, this means that TeamSAP partners are available to carry out implementations, as well as ASAP-certified partners to carry out "Powered by ASAP projects". TeamSAP projects refer to projects carried out by TeamSAP partners, the use of ASAP or Powered-By implementation methodology, Project Quality Review, the assignment of an SAP Coach, and SAP's support on the project's steering committee. All of these are factors contributing to a successful implementation.

The following key benefits will enable you to carry out a more effective R/3 implementation and make effective use of your available resources:

  • AcceleratedSAP helps to manage a "Big Bang" implementation strategy with the focus on essential business processes.
  • There is a high degree of planning accuracy (time, costs, resources) through the Project Estimator and the Business Blueprint.
  • AcceleratedSAP lays the foundation for continuous change and efficient reconfiguration when business or legal requirements change.
  • You have a uniform approach to R/3 implementations among partners and consultants worldwide.
  • There is an assured quality and know-how transfer during implementation.
  • You can reuse the results of your configuration for subsequent implementation projects.
  • You have reduced implementation costs and quicker ROI.

ASAP Phase 1: Project Preparation

In this phase of the ASAP Roadmap, decision-makers define clear project objectives and an efficient decision-making process. A project charter is issued, an implementation strategy is outlined, and the project team as well as its working environment are established.

The first step is for the project managers to set up the implementation project(s). They draw up a rough draft of the project, appoint the project team and hold a kickoff meeting. The kickoff meeting is critical, since at this time the project team and process owners become aware of the project charter and objectives and are allocated their responsibilities, lasting throughout the project.

Initial Project Scope/Technical Requirements

As the reference point for initial project scope, and updates or changes to the R/3 implementation, the project team can use the Enterprise Area Scope Document to compare the enterprise’s requirements with the business processes and functions offered by R/3. In this way the project scope is roughly defined from a business and IT view. The former view concentrates on the enterprise’s business processes that are to be supported by IT; the latter focuses on the IT required, down to the network and memory requirements.

Project Organization and Roles

One of the first work packages in Phase 1 is the definition of the overall project team and the specification of project roles to be assumed during implementation.

The main roles in an implementation project are that of the project manager, the application consultants, the business process team leader, the technical project leader/systems adminstrator, and the development project leader.

  • The project manager is responsible for planning and carrying out the project.
  • The application consultant creates the Business Blueprint by identifying the business process requirements, configures the R/3 System together with the business process team, transfers knowledge to the customer team members and assists the business process team with testing.
  • The business process team lead at the customer site manages the work involved in analyzing and documenting the enterprise's business processes. This person directs and works with the business process team members, process owners, and users in order to develop the R/3 design, configure the system and validate the design. Furthermore, this person ensures that the R/3 implementation is tested and documented, and obtains agreement from both the business process owners and users.
  • The technical team lead at the customer site is responsible for managing the completion of all technical project deliverables. The technical team lead works with the Project Manager to complete the technical requirements planning, and to plan and manage the technical scope and resources schedule. The technical team lead is also responsible for the overall technical architecture of the R/3 System.
  • The development project lead is responsible for managing the definition, development and testing of necessary conversions, interfaces, reports, enhancements and authorizations.
  • The R/3 system administrator is responsible for configuring, monitoring, tuning, and troubleshooting the R/3 technical environment on an ongoing basis, as well as performing checks, tasks, and backups within the technical environment, scheduling and executing the R/3 transport system and Computing Center Management System (CCMS). The R/3 system administrator manages and executes the R/3 installations, upgrades and system patches.

An example of an accelerator in ASAP is the "Project Staffing User Guide", which outlines all of the project roles, expectations, time commitments and responsibilities for everyone involved in the implementation. It also contains pre-defined organizational chart templates for the implementation team.

Implementation Scope

Phase 1 includes a scoping document called the Enterprise Area Scope Document, which is based on the R/3 Reference Model and can be generated using the Project Estimator. It contains high-level user-defined views of the scope of the project, as well as defining the corresponding plants, sites, distribution channels, and legal entities. This scoping document maps to the Question & Answer Database (Q&Adb), which is used in Phase 2 to determine the detailed process and development requirements.

ASAP includes many document and reporting templates, as well as examples that can be used to help determine implementation standards and procedures. Procedures for scope changes, issue resolution, and team communication need to be defined. AcceleratedSAP provides you with instructions, examples and templates to put these procedures in place.

One of the most important procedures to be defined in Phase 1 is how to carry out project documentation, in particular R/3 System design documentation. For information on project decisions, issue resolution, or configuration changes required at a later date, good project documentation is invaluable. The following types of documentation should be defined in this phase and maintained throughout the project:

  • Project deliverables
  • Project work papers and internal project team documentation
  • Business processes to be implemented
  • R/3 design specifications for enterprise-specific enhancements
  • Documentation on R/3 configuration and Customizing settings
  • End user documentation
  • Code corrections using OSS notes or Hot Packages
  • Service reports and documentation.

More information on documenting the R/3 configuration can be found in Phase 3.

System Landscape and Technical Requirements

In Phase 1, the project team decides on the system landscape, as well as on the high-level strategies for creating R/3 clients, implementing new releases and transporting system settings. One R/3 System can be divided into multiple clients as needed, thus allowing for the handling of separate enterprises in one R/3 installation.

The technical requirements for implementing R/3 include defining the infrastructure needed and procuring the hardware and the necessary interfaces. For this purpose, you can make use of the Quick Sizing Service, which can be accessed via SAPNet.

The Quick Sizing Tool, or Quick Sizer calculates CPU, disk and memory resource categories based on the number of users working with the different components of the R/3 System in a hardware and database independent format. The tool intends to give customers an idea of the system size necessary to run the required workload, and therefore provides input for initial budget planning. It also offers the possibility of transactional/quantity-based sizing, therefore enabling customers to include their batch load in the sizing as well.

The Quick Sizing Service should be used as an input for hardware partners to identify your hardware needs and also get an idea of the probable size of the needed hardware configuration for project and budget planning reasons.

The archiving concept is drawn up in Phase 1. Regular, targeted archiving optimizes your hardware use and avoids performance problems. With the Remote Archiving Service, SAP enables you to outsource all the tasks associated with archiving the data in your R/3 System and have them performed by SAP specialists. As part of this service, SAP also customizes the archiving configuration in your system or verifies the current configuration. However, the Remote Archiving Service cannot provide the concept for your archiving strategy - it must be worked out as part of your implementation project.

It might seem too early to discuss archiving at this stage. However, eperience has shown that it is important to define the strategy as early as possible to ensure that archiving can be carried out when needed later.

Issues Database

Managing and resolving issues that come up during the project is an essential responsibility of the project manager and is fundamental to the success of an implementation. The focus of the manager should be to resolve or prevent issues. However, escalation procedures need to be in place in case an issue cannot be solved by the project team. Typically, issues must be resolved before phase completion or before beginning the next phase.

Issues can be regarded as hurdles that are identified during a project and may influence the success of the project. They can be:

  • Unanticipated tasks
  • Normal tasks that cannot be completed
  • External factors that need to be dealt with

The Issues Database allows the project team to enter, track, and report on project issues. The database supports the following data for each issue identified:

  • Priority
  • Project phase
  • Status
  • People responsible
  • Date required for solution
  • Date resolved
  • Classification (for example: resource, documentation, training or configuration issue)

Based on this data, the Issues Database enables you to quickly retrieve the information on specific issues by using filters and views on the data entered.

Concept Check Tool

ASAP also includes a concept check tool to evaluate the system concept and configuration and alert you to potential performance or design issues.

Using the tool checklists, you can analyze the project and implementation work either by yourself or with the assistance of your SAP consultant. The check focuses on project organization and the configuration of the R/3 applications.

Fig. Xxx: The Concept Check Tool

The checklists are designed dynamically, that is, as each question is answered, the following questions are selected so that you only answer those questions relevant to your system configuration. The checklists are used in the first two phases AcceleratedSAP, as it is advisable to deal with questions relating to each phase of the project as they arise.

IDES – the R/3 Model Company

The R/3 International Demo and Education System (IDES) is an additional R/3 system/client which is supplied with predefined system settings and master data. It is an integrated, fully configured, fully functional model company with an international scope and sample product range, which you can use early in your implementation. It is used, for example, in Phase 2 as a reference for R/3 processes and functionality. After defining the corresponding link, you can branch directly from the business process transactions of the Q&Adb to the live transaction in IDES.

In order to get started with the R/3 System quickly, you can use IDES to help visualize your own solution. During the planning phase, you can try out all the business scenarios to find the design best suited to your requirements. IDES also forms the basis for SAP’s entire R/3 training program, including examples and exercises, and is the ideal way of preparing for release changeovers.

ASAP Phase 2: Business Blueprint

In this phase you document and define the scope of your R/3 implementation and create the Business Blueprint. The Business Blueprint is a detailed documentation of your company's requirements in Winword format. Application consultants and the Business Process Teams achieve a common understanding of how the enterprise intends to run its business within the R/3 System, by carrying out requirements-gathering workshops.

During Phase 2, the project team completes R/3 Level 2 training; this is recommended as early as possible and before the workshops start.

Fig. : Elements of the Business Blueprint

The project team selects the processes that best fit your business from R/3's functional offering, using the following tools:

  • AcceleratedSAP Implementation Assistant
  • Question and Answer Database (Q&Adb)
  • Business Process Master List (BPML)
  • R/3 Structure Modeler
  • Business Navigator and external modeling tools

Project Management

Establishing a proper cycle of project management activities ensures that the implementation project stays on target. Project Management includes all project planning, controlling and updating activities. The activities in this work package are:

  • Conducting Status Meetings for the Project Team

In the status meetings each project team’s status is reported on, and important information is shared among the different project teams, so that there is a complete picture of the implementation process and progress. Progress impacts budget, scheduling and resources, and also the go-live date. It is important to coordinate integration aspects between the different project teams.

  • Conducting the Steering Committee Meetings

These meetings update the Steering Committee on the project status and obtain decisions about project issues that cannot be resolved by the project team (for example, changing the schedule or obtaining additional resources).

  • General Project Management

ASAP makes sure that additional tasks that support the implementation project or form the basis of further project planning are not overlooked.

  • Addressing organizational issues relating to organizational Change Management.

Project Team Training

Training the project team should reflect the scope of the R/3 implementation and the needs of the individual team members. You want to conduct project team training in order for team members to obtain R/3 functional and technical knowledge to be effective members of the implementation project team. In the Business Blueprint phase, project team members attend Level 2 training courses.

Developing the System Environment

At this point, you install and technically configure the quality assurance and development systems. Within this work package, you define and test system administration procedures for the development system.

The foundations of the technical design are laid by the work done in the project preparation phase. The definitions of the implementation scope and the system landscape are used for a detailed analysis of your hardware, operating system, database, and network requirements.

  • ASAP assists in evaluating the impact of the implementation scope on the hardware or network infrastructure with the organization.
  • You also check whether processes used at particular workplaces call for special hardware requirements (for example, different screen sizes, PC configurations).

It is also important to define the strategy for maintaining the system landscape in more detail. This should include steps on how to provide R/3 release upgrades, integrate hot packages, along with operating system and database upgrades.

The technical design is presented to the steering committee to be signed off at the end of the Business Blueprint phase.

Even though the development system environment is not needed by the business process teams until the end of the Business Blueprint phase, it is recommended that the development system (and possibly a test/quality assurance system) be installed as early as possible. This will enable the technical team to have a few weeks to work with the R/3 System prior to any development or Customizing activities. AcceleratedSAP provides a checklist for installing the hardware and the R/3 System, and for verifying the R/3 configuration.

The next step is to install and configure the development system clients. During this activity you set up R/3 clients to reflect the business process and organizational decisions.

There are a number of pre-configured systems that are designed for different enterprise and business types. These systems are described in more detail at the end of this chapter. They should however be installed as part of the system landscape before the start of the Realization phase. If you are using the Ready-to-Run R/3 (RRR), this represents an accelerator for this work package, because R/3 is pre-installed and the parameters of the Basis System are preconfigured.

The R/3 Systems Operations Manual for the system adminstrator is begun to be put together here. It contains the documentation on the system installation and system administration procedures/policies, with detailed descriptions, persons responsible and escalation management plans for all R/3 System management activities.

The Pre-Configured Remote Link is a service used to simplify the setup of the OSS link between the customer and SAP. The setup is not difficult, but entails extensive logistical organization. The customer receives the hardware, OSS IDs, software and hardware configuration, and training and support for this area.

This service can save many days of effort for the customer at the beginning of the project. Among other things, the "rcPack" as it is called, contains an analysis of network and telecommunications infrastructure, a determination and proposal for an optimal mode of transmission, application forms and documents required by carriers, and purchase and delivery of necessary hardware.

After the R/3 System is installed, it is necessary to configure the operational enviroment for the development system. This should include the backup/restore procedures along with the CCMS (Computing Center Management System) settings. These tasks are an ongoing process throughout the Business Blueprint Phase.

AcceleratedSAP provides a list of daily checks and reports that should be run to help administer and maintain the development environment. The Guidebook "System Administration Made Easy", written by the R/3 Simplification Group for both Windows NT and Unix, is available as an accelerator.

The Implementation Guide is described in detail in the Realization phase. At this point in the project, however, it should be created for the enterprise based on the implementation scope. The IMG is used as a reference at the last stages of the business process definition, therefore, you will want to have this in place before beginning the business process definition.

Defining the Organizational Structure

An important step during the implementation of R/3 is the mapping of enterprise-specific structures and requirements using R/3 organizational units. Decisions on the use of specific organizational units are influenced by various factors relevant to the organization itself and the implementation goals it is pursuing.

Fig.: R/3 Structure Modeler for displaying organizational structures

The selection, usage specification and linking of the R/3 organizational units should be carried out at an early point in the project, and involves management as well as user departments. Usually there are several different possibilities of mapping enterprise-specific organizational units. You can define alternative organizational structure scenarios in order to compare them and decide on the most suitable one.

Questionnaires and a graphic display support the discussion on organizational units between SAP consultants and their customers. Mapping the enterprise onto R/3 organizational units becomes transparent, and the simple, systematic display supports the interpretation of differences between alternative structure scenarios.

In order to create structure scenarios, SAP has developed the R/3 Structure Modeler, included in AcceleratedSAP. It is used as an add-on under Visio® 5.0 and offers comprehensive support due to its extended graphic functionality (creation, naming and allocating of new instances of the R/3 System, consistency checks, definition of views, scenario-specific documentation, help files). The Structure Modeler is available in German and English. It is integrated in the Knowledge Corner of the ASAP Roadmap.

The use of tile diagrams has proven effective for the graphic display of structure scenarios. Every occurrence (instance) of an R/3 organizational unit is represented as a colored tile. The tiles representing instances of the same R/3 organizational unit have the same color. The positioning of the tiles in several layers enables you to recognize relationships between them.

The Q&Adb enables you to describe the structure of your enterprise on two levels:

  • The Business Overview level, with organizational structure questions enabling an analysis of enterprise-specific determining factors, and
  • Organizational questions for each enterprise area.

The Structure Modeler also enables you to illustrate your organizational structure in relation to a distributed system infrastructure.

Defining the Business Processes

After you have defined your organizational structure for R/3, the definition of the business process for your Business Blueprint is the next step. You now map the enterprise requirements onto R/3 business processes, in order to create the conceptual design for your R/3 implementation. For this, the following activities need to be carried out:

  • Conducting business process workshops
  • Completing the Business Blueprint, reviewing it and obtaining management signoff
  • Setting up an end user training schedule

Besides determining the R/3 functionality to be implemented, the following types of requirements should be identified in the business process workshops:

  • Reporting requirements
  • Interface requirements
  • Conversion requirements
  • Enhancement requirements
  • Authorization requirements

Since all the results gathered during the workshops will subsequently create the Business Blueprint, the importance of this step cannot be underestimated. The main tool used to define the business processes is the AcceleratedSAP Question & Answer Database in conjunction with the R/3 Reference Model. In the process, information is gathered using the following tools:

  • Business Process Questions (via R/3 Reference Model)
  • Customer Input (CI) Template
  • Business Process Master List
  • Knowledge Corner

R/3 Reference Model

The R/3 Reference Model contains over 1,200 business processes, created on the basis of feedback from R/3 customers on their "best business practices". This structure and visual representation in models support the business process discussions, as well as being used to graphically illustrate a particular area of functionality. There are different types of models available for different target groups and purposes. Project managers, for example, need an overview of all the R/3 components and processes, whereas a team member is more likely to require the details of a process.

The R/3 Reference Model serves as the basis for business engineering and the definition of business process requirements. Using the various types of models, you can quickly identify potential for business process optimization.

Fig. : Different types of models in the R/3 Reference Model

The R/3 Reference Model can be used as the basis for the following:

Comparing the standard R/3 functionality with your enterprise's own organizational structures and processes, and defining all the relevant processes and functions, in order to create the Business Blueprint

Creating documentation (including graphics) for the conceptual design

Optimizing your business processes

Training the project team and users

Writing user documentation

The R/3 Reference contains the following types of models designed for different target groups and goals:

  • Process model

The main type of model, containing process flow views of the entire R/3 functionality, for example, procurement of consumable materials or purchase order processing. This model is used, among other things, for industry-specific modeling and is described below in greater detail.

  • Component hierarchy

In the component hierarchy, you select the R/3 components you want to use in your enterprise to support your business processes. Examples would be the component HR Human Resources, or Accounts Payable from FI Financials. This has a chain of effects throughout the entire R/3 System. The selections made in the component hierarchy also determine the structure of the following:

  • Implementation Guide (for R/3 Customizing)
  • Session Manager (to define company menu, user-specific menus)
  • The Profile Generator (for user authorizations)

Fig. 26: Configuring the IMG by selecting the application components

For more information, see the section on R/3 Customizing under Phase 3.

  • The Business Object model, which is a description of about 200 business objects such as customers, vendors, employees, cost centers, etc.

The main purpose of the Business Object Model is the determination of the input/output assignment of business objects. These are lists that tell you which business objects are required as input for a process and which are created as output. It is also used for checking the data and processes in the productive system.

Each object in the system represents something in the real world, for example, a sales order or customer. Business object technology has several merits, not least the integration and synergies between objects from both a technical and a business viewpoint. R/3 Business Objects as real-world entities will emerge more and more to allow enterprises to design parts of their business processes by using objects.

The R/3 Reference Model, together with its process models, business objects, business object models, data models and their data and links, is stored in the R/3 Repository. It also contains technical information such as data definitions, screen definitions and program objects that are used for developing and enhancing the R/3 System. In addition, the R/3 Reference Model, in particular the process model, forms the basis of requirements gathering for the Business Blueprint in the Q&Adb.

The R/3 Reference Model is used to access and link processes and business objects. Since the business objects are used to communicate with the R/3 Repository, both the data model and the structure and contents of the underlying tables can be accessed. This makes interface and enhancement design considerably simpler.

Process Model

Together, the organizational structure and the model graphic (see below) form a powerful basis for the modeling of all business process requirements and their optimization. Process models are structured hierarchically and contain the following elements:

  • Enterprise process areas
  • : an area in an enterprise that has responsibility for certain business scenarios. Examples of enterprise process areas are sales or procurement. Enterprise process areas are used for structuring purposes only and are not represented graphically.
  • Business scenarios
  • are assigned to a particular enterprise process area, and describe on an abstract level the logical flow of your business across different application areas, such as Materials Management or Quality Management, using processes. Event-driven process chains (EPCs) and value chains are used to visualize them. An example of a business scenario would be "Sales order processing for assemble-to-order".
  • Process groups
  • are groups of individual processes that are bundled so that they can be visualized more easily.
  • Processes
  • : These describe the smallest self-contained business sequences and represent the possibilities within a given R/3 transaction, where detailed functions are carried out. Processes are also represented graphically as EPCs.

Fig. 13: Hierarchical structure of business processes in the R/3 Reference Model

Industry-specific Reference Model

In Release 4.0, the R/3 Reference Model was revised and aligned more closely with different industries’ needs. The R/3 Reference Model now matches many the requirements and business process structures of many industries quite precisely, and more effectively bridges the gap between the business and technical viewpoints.

The industry-specific R/3 Reference Model was developed in cooperation with leading industry players using their underlying concepts and language. As a result, you do not have "re-invent the wheel". In the Q&Adb, you can simply choose the scenarios that correspond to your type of business. Moreover, you can mix and match scenarios, and change them to suit your requirements. Examples of industry-specific senarios can be seen in the graphic below.

Fig. 23: Industry-specific Reference Model with Enterprise Process Areas and Business Scenarios

Visualization of Process Models

Process models can be visualized in two different ways: the high-level value chain and the more detailed event-driven process chain (EPC), described below.

Value chains can be defined for a particular type of business or industry, showing the overall course of a business process across enterprise process areas. On a very highly aggregated level, the value chains show how business scenarios are linked. Value chains show the integration of business scenarios and processes across departmental boundaries. They therefore offer an ideal opportunity to optimize business structures and routines.

Fig. Xx: Value chain for baking goods production

Event-driven process chains (EPCs) link data, tasks and organizations, and are therefore an important element in business process design. As well as describing the chronological sequence of steps in a process, they also take into account aspects of the organization and information requirements. Elements of EPCs are explained in more detail below.

Fig. 12 (2-5): The basic structure of an event-driven process chain

EPCs consist of four basic elements:

Navigation in the R/3 Reference Model

You can display the contents of the R/3 Reference Model with the Business Navigator or the Business Navigator Web, which are fully integrated into the R/3 System. You can display the model in either of two hierarchy views, as described above:

  • Process flow view
  • Component view

The following graphic shows the process flow view of the R/3 Reference Model in the Business Navigator.

Fig.: Process Flow View of Business Navigator

The Business Navigator as well as the Business Navigator Web allow you to browse through a model in order to understand its structure and see how processes are related and organized on an enterprise-wide level.

In order to start the Business Navigator Web, you must have access to the R/3 Reference Model or to one or more customer-specific models.

Fig. 18: Business Navigator Web

When an EPC diagram is displayed in the Diagram Viewer of the Business Navigator Web, you can study it by animating it, that is, by walking through each function and choice point in order to observe the flow of control and dependencies in the process represented by that diagram. You can follow the flow of control into different diagrams to see how various processes are connected to one another.

To install the web server for the Business Navigator Web, you must have the Microsoft Internet Information Server (IIS) installed on a Windows NT server. A Java-enabled web browser installed on the client machine is also necessary.

The R/3 Reference Model can also be viewed and modified as desired for your enterprise with external PC-based graphics and modeling tools. These tools must be licensed separately. Modeling tools available with the R/3 Reference model are:

These modeling tools can be launched from the Q&Adb.

Question and Answer Database

The Question & Answer Database (Q&Adb) contains technical and general business questions, the answers to which are the input for the creation of the Business Blueprint. The questions are designed to determine the enterprise's detailed business requirements in an integrated environment. In conjunction with the Business Process Master List, the Q&Adb is also used to determine the baseline scope, cycle plan and integration testing scenarios used in later phases.

  • The Baseline Scope Document

Defines the business processes and requirements that will be configured and tested during the baseline configuration session.

  • Cycle Plan

A tightly controlled group of business processes, which together constitute an optimal sequence and assembly that is used for configuring and developing the R/3 solution.

  • Integration Test Plan

The plan that joins together the defined resources, time frames, scope and procedures for executing the integration test.

Fig. Xx: Defining the business process requirements via questions in the Q&Adb

You can also add, change, and delete questionnaire content in the Q&Adb. In this way, project teams can customize the requirements gathering process by creating new questions and editing existing ones.

The business process questions and customer input template (see below) are oriented along the current release of the R/3 Reference Model, specifically of the process model. Within this framework, what is in and out of scope is determined for the project, by toggling the business scenario or process "in" or "out" of scope in the Q&Adb.

There are several reports that you can generate once the questions in your Q&Adb have been completed. One important report is the Enterprise Area Scope Document defined in Phase 1: This is an Excel spreadsheet containing the SAP enterprise areas and scenarios that a company will be implementing. It is used in initial scoping of the project, to assign Business Process Owners, and also as a reference to begin Business Blueprinting.

Further reports are the Business Process Master List (Excel file) and the Business Blueprint (Winword file). These are explained in more detail below. You can also generate an Excel spreadsheet of all open issues in the Issues database.

Customer Input Template

When the business processes are being defined, the Customer Input Template forms a standard structure for gathering specific data on the business processes. The customer input template can be modified to reflect the areas of concern for your implementation project and is used in conjunction with the business process questions.

Fig. Xx: The CI template in the Q&Adb

The following graphic shows how tools are used in combination to ensure the flow of information through the project.

Fig. : Flow of project information through the Q&Adb

When a process or a scenario appears more than once, one of the processes or scenarios can be defined as the dominant (representing the 80% case), and the other processes/scenarios are then defined as subordinate. This means that answers given to the dominant will be used as a reference for all subordinates.

After the business process workshops have concluded, the results are processed and documented within the Q&Adb. If enterprise-specific processes come to light, they can be added to the Q&Adb at any level, as needed to provide one complete database for your requirements.

Completing the Business Blueprint

The Business Blueprint serves as your conceptual master plan and is assembled into a detailed written document. This document summarizes and documents the business requirements in detail, and serves as the basis for organization, configuration and, if necessary, development activities.

The Business Process Master List (BPML) is the primary activity-tracking and control mechanism used by the project management team during the Realization phase.

The BPML is first created at the end of the Business Blueprint phase from the Q&Adb in order to create the Baseline Scope Document and then used during the next phase for monitoring and control of the R/3 configuration and testing activities. You can find more information on the BPML in the next chapter.

The baseline scope is generated via the Q&Adb and the Business Process Master List. The amount to be included in this scope will vary based on each individual project implementation. As a guideline, the baseline scope should target to address roughly 80% of the total business requirements.

As a last step in this phase, a quality check, the final verification of all deliverables, from this phase should be carried out. You can also use the Concept Check Tool for this. However, it is also important that continuous quality checks be performed throughout the phase as tasks are completed.

The Business Blueprint ensures that everybody has an accurate understanding of the final scope of the project regarding business processes, organizational structure, system environment, project team training and project standards. Issues regarding changes in scope, impact on budget and resource planning must be addressed.

Together, ASAP and the Business Engineer split up the work of creating the Business Blueprint and configuring R/3 in manageable steps, starting at the top with the overall structure of your business and gradually working down to the details of your business and process requirements.

Accelerated Solutions/Preconfiguration

SAP's Accelerated Solutions speed up implementations by providing you with two important types of preconfiguration:

Ready-to-Run R/3

Together with AcceleratedSAP, Ready-to-Run R/3 can be used in order to reduce the number of days necessary for technical support and consulting when installing R/3 at the customer site. This turnkey system provides a pre-installed and pre-configured R/3 solution that can save customers up to 25 consulting days. It consists of a complete hardware, software and network infrastructure, as well as a comprehensive operations and support concept. Ready-to-Run R/3 is available from many hardware manufacturers, and uses the Microsoft Windows NT operating system.

Preconfigured US and Canadian Clients

The preconfigured client is a set of transport files consisting of the most frequently used U.S. and Canadian Customizing settings.

Configured features for the U.S./Canadian market:

R/3 modules containing preconfigured items are FI/CO, MM, SD, AM, some PP and Product Costing.

The preconfigured client can be used as:

Preconfigured Industry Systems

Today, much industry-specific know-how is already available. There are written documents, presentations, industry-specific descriptions of how the processes in the R/3 System run, industry-specific system settings, master data, etc. The main goal of preconfigured industry systems is to provide this information on industry-specific solutions in a structured and logical way.

Preconfigured systems are available or planned for the following lines of industry:

Preconfigured industry systems are also often called "Industry Templates" or "Industry Blueprints". The information in the preconfigured industry systems can be used as a basis for the Blueprint and Realization phases and for training the project team.

The preconfigured industry systems show you that SAP has a fundamental knowledge of your industry's business processes and of how to implement these processes in R/3.

Using preconfigured industry systems for an R/3 implementation can help to speed up the implementation process and reduce costs, lower the risk of wrong estimates with respect to the time and costs of the implementation, avoid implementation errors and document the implemented functionality.

A preconfigured industry system includes the following:

  • The industry model with industry-specific business scenarios and processes. For each model element, an industry-specific or even enterprise-specific term can be used.
  • Industry-specific system settings (Customizing settings) to run the business scenarios in the R/3 System
  • Sample master data to use for every business scenario
  • Documentation of all steps and presentations with examples and explanations from the industry

Together with consultants and industry leaders, SAP has already created a number of preconfigured R/3 industry systems containing configured settings and master data. These can be employed for training and simulation purposes, but can also be used as the basis for your own R/3 System.

Fig. 21: Preconfigured R/3 Systems for vertical industries

SAP is committed to providing preconfigured industry systems for all of the SAP Industry solutions. However, the preconfigured system principle is not limited to those provided by SAP. Partners and enterprises can create their own models for accelerating implementation in particular areas or markets.

The concept of preconfigured industry systems also enables software partners or enterprises to include their specific add-ons to the specific preconfigured industry system.